Project tag: Increased resource efficiency in mineral and metallurgical processes
ANCORELOG: Analytical Core Logging System
Project duration: 1 January 2018 – 31 March 2021 Objective ANCORELOG, the analytical core logging system, aims to deliver precise...
read more about "ANCORELOG: Analytical Core Logging System"
SO4Control. Scale-up of Solution for Mining Water Sulfate Control with Side-product Recovery
Project duration: 1 January 2018 – 30 June 2020 Objective SO4Control is a mine water management concept that combines environmental...
read more about "SO4Control. Scale-up of Solution for Mining Water Sulfate Control with Side-product Recovery"
NetFlot: Flotation-Network
Project duration: 1 January 2016 – 31 December 2018 Objective Identification of existing flotation models and of infrastructure that allows...
read more about "NetFlot: Flotation-Network"
RECOVER: Innovation in Motion: Red mud and Copper slag Valorisation in Engineered Products
Project duration: 1 April 2017 – 31 March 2020 Objective The general objective of this Upscaling project is to produce...
read more about "RECOVER: Innovation in Motion: Red mud and Copper slag Valorisation in Engineered Products"
MICRO–ECOS: Microscale and Electrometallurgically assisted Cleaning of Complex Sulphide Ores
Project duration: 1 April 2017 – 31 March 2020 Objective The Challenge: Recovery of metals in the flotation circuit is affected by...
read more about "MICRO–ECOS: Microscale and Electrometallurgically assisted Cleaning of Complex Sulphide Ores"
FLAME: FLy Ash to valuable MinErals
Project duration: 1 April 2017 – 31 March 2020 Objective The FLAME project is perfectly aligned with the KIC Raw...
read more about "FLAME: FLy Ash to valuable MinErals"
MaDurOS: Material Durability for Off-Shore
Project duration: 1 January 2016 – 31 December 2018 Objective In many cases the absence of dedicated testing and simulation...
read more about "MaDurOS: Material Durability for Off-Shore"
RED_SCOPE: Recovery of Effluent Discharge for Sustainable Copper Processing in Europe
Project duration: 1 April 2017 – 31 December 2019 Objective The project will assess the technical and economic feasibility study...
read more about "RED_SCOPE: Recovery of Effluent Discharge for Sustainable Copper Processing in Europe"
AMCO: Automated Microscopic Characterization of Ores
Project duration: 1 January 2016 – 31 December 2018 Objective The production and marketing of an innovative, low-cost and user-friendly,...
read more about "AMCO: Automated Microscopic Characterization of Ores"
EWT-CYNCOR: Electrochemical water treatment for cyanide and nitrogen compounds removal
Project duration: 1 January 2017 – 31 March 2019 Objective The aim of the EWT-CYNCOR is to upscale electrochemical cyanide...
read more about "EWT-CYNCOR: Electrochemical water treatment for cyanide and nitrogen compounds removal"