Project tag: Increased resource efficiency in mineral and metallurgical processes
INCO-Piles-2020. International consortium to recover CRMs from stockpiles/tailings targeting RIS
Project duration: 1 January 2020 – 31 December 2021 Objective Mining stockpiles/tailings are strategic to recover Critical Raw Materials. Technological...
read more about "INCO-Piles-2020. International consortium to recover CRMs from stockpiles/tailings targeting RIS"
Credit: Chemical recycling through electrodialysis treatment
Project duration: 15 October 2018 – 31 December 2021 Objective The Credit project will develop a novel technology concept for...
read more about "Credit: Chemical recycling through electrodialysis treatment"
ALPE: Advanced Low-Platinum hierarchical Electrocatalysts for low-T fuel cells
Project duration: 1 January 2020 – 31 May 2023 Objective The project ALPE aims at developing and commercializing a proton-exchange...
read more about "ALPE: Advanced Low-Platinum hierarchical Electrocatalysts for low-T fuel cells"
iTARG3T: Innovative targeting & processing of W-Sn-Ta-Li ores: towards EU’s self-supply
Project duration: 1 January 2019 – 31 December 2021 Objective One of the wealthiest tungsten-tin-(tantalum-lithium) mineral belts in the world is...
read more about "iTARG3T: Innovative targeting & processing of W-Sn-Ta-Li ores: towards EU’s self-supply"
BioLeach: Innovative Bio-treatment of RM
Project duration: 1 April 2019 – 31 March 2022 Objective High economic investments into the import of raw materials which are...
read more about "BioLeach: Innovative Bio-treatment of RM"
ELI: European Lithium Institute
Project duration: 1 January 2019 – 31 December 2020 Objective Driven by the European energy transition and electric mobility the demand...
read more about "ELI: European Lithium Institute"
WhISPER: Waterless Iron Silicate Production with Energy Recovery
Project duration: 1 January 2019 – 31 January 2021 Objective In the pyrometallurgical copper smelting process the main product is copper,...
read more about "WhISPER: Waterless Iron Silicate Production with Energy Recovery"
UPGRADE: Upscaling of a strip-cast-process for Heavy Rare Earth – lean magnet grades
Project duration: 1 January 2019 – 31 December 2021 Objective Sintered Nd-Fe-B-type permanent magnets (PM) are essential components of electrical machines...
read more about "UPGRADE: Upscaling of a strip-cast-process for Heavy Rare Earth – lean magnet grades"
ThermoSpray: Scale-up of a thermal spray decomposition process for niobium oxide production
Project duration: 1 January 2019 – 30 September 2020 Objective H.C. Starck has developed a thermal spray decomposition of a niobium-containing...
read more about "ThermoSpray: Scale-up of a thermal spray decomposition process for niobium oxide production"
SAMOA: Sustainable Aluminium additive Manufacturing for high performance Applications
Project duration: 1 April 2019 – 31 March 2022 Objective 3D printing of metals, specifically known as Additive Manufacturing (AM), gained...
read more about "SAMOA: Sustainable Aluminium additive Manufacturing for high performance Applications"